Infrastructure

Infrastructure

GTV has state-of-the-art manufacturing facilities spread over 11 acres with 2 manufacturing units, having a monthly production capacity of 1000 tons and workforce of around 300 employees. GTV's credentials include: ISO 9001:2015 certification for both its production units. Please take a walkthrough of our infrastructure below:

Some of the largest machines/facilities at GTV are as follows: 

CNC Vertical Turret Lathes (VTL) upto 12 metres swing X 6 metres working height and table load of 150MT

CNC Floor borers upto X=15m, Y=6m, Z=2.2m, spindle 205mm dia and CNC Rotary Table of 80MT capacity

EOT cranes upto 150MT single piece handling capacity 

Plate Rolling / Bending with Pre-Pinch Facility upto 70mm X 3100mm 

Hydraulic Press Brakes 500MT capacity upto 30mm X 3100 

Stress Relieving (PWHT) that can accomodate job sizes upto 13 metres X 13 metres X 8 metres 

Major expansions are underway with plans to have automated machinery installed for streamlined production. The production capacity is estimated to ramp up to 2,000 tons per month, shortly.

© 2024 GTV Engineering Ltd. All rights reserved. Website Designed and Managed by Embed Studios

© 2024 GTV Engineering Ltd. All rights reserved. Website Designed and Managed by Embed Studios

© 2024 GTV Engineering Ltd. All rights reserved. Website Designed and Managed by Embed Studios